摘要
文章介绍了北洛河流域水质监测站网的规划设计方法。它是在充分占有环境背景资料的基础上,分析了解现有水质状况的时空分布规律,进行水质的综合评价和特征区划,然后按照设站目的进行站网设计和可靠性分析。北洛河流域规划的12个水质监测站,可依据经济发展对水质环境要求的迫切程度逐步实现。
The planning of water quality monitoring network in Beiluo River basin included three main steps: first, finding out the distributing regulality of water quality in time and space based on great amount of environmental information of the basin; secondly, overall assessing water qualities and its zonation of water quality characteristics; lastly, planning monitoring stations and network and analysing their reliabilities. The 12 planned water quality monitoring stations will be set up gradully in the light of the demands of economic development on water quality.
出处
《人民黄河》
CAS
北大核心
1989年第6期25-29,共5页
Yellow River