期刊文献+

基于大规模定制延迟制造技术的时间模型及快速响应方法研究 被引量:2

The Time Model Based on the Postponement in Mass Customization and the Way to Responding Rapidly
下载PDF
导出
摘要 本文通过大规模定制生产模式的论述,指出延迟制造技术是解耦大规模定制中时间、成本和个性化的矛盾问题的较好的解决方式,并对延迟制造技术进行了新的分类。针对大规模定制的快速响应问题,提取了面向大规模定制的时间模型并进行了分析;最后指出大规模定制快速响应问题的解决方案是基于延迟制造基础上的可重组制造系统。 The postponement strategy is considered to be the solution of the problem of time,cost and individualized through discussing Mass Customizatrion.And it's new patterns categorized.A time model is drawn for the question of responding rapidly to the customer's requirement.At last,the reconfigurable manufacturin system is pointed out to be the solution.
出处 《西安财经学院学报》 2004年第6期81-84,共4页 Journal of Xi’an University of Finance & Economics
关键词 大规模定制生产模式 延迟制造技术 问题 快速响应 成本 方法研究 解决方案 个性化 矛盾 基础 mass customization postponement time model reconfigurable manufacturing system(RMS)
  • 相关文献

参考文献6

  • 1B.Joseph PineⅡ.大规模定制--企业竞争新前沿[M].北京:中国人民大学出版社,2000.
  • 2Remko van Hoek. Postponement manufacturing: a case study in the food supply chain. Supply Chain Management, 1997.
  • 3Bowersox D J, Closs D J, Logistical Management, the Integrated Supply Chain Process [ M]. New York:Macmillan Publishing Company, 1998.
  • 4王彧,马士华.利用延迟制造重塑生产过程[J].中外管理导报,2002(4):16-18. 被引量:4
  • 5祁国宁,顾新建,谭建荣.大批量定制技术及其应用[M].北京:机械工业出版社,2002.
  • 6周军,邓建新,刘战强,艾兴,杨学锋.可重组制造系统[J].机械设计,2003,20(10):1-4. 被引量:6

二级参考文献22

  • 1Y Koren, U Heisel, et al. Reconfigurable manufacturing system[J ].Annals of the CIRP, 1999,48(2):1 - 14.
  • 2Mcstafa G, Mehrabi A, Galip Ulsoy, et al. Reconfigurable manufacturing systems and their enabling technologies[J]. International J. of Manufacturing Technology and Management, 2000, 1 (1): 113 -130.
  • 3M G Mehrabi, A G Ulsoy, Y Koren. Reconfigurable manufacturing systems: Key to future manufacturing[J]. Journal of intelligent manufacturing. 2000,11 (4) : 403 - 419.
  • 4R G Landers, B K Min, Y Koren. Reconfigurable machine tools[J ].Annals of the CIRP, 2001,50( 1 ) : 269 - 274.
  • 5Bowersox, D.J and Closs, D.J, Logistical Management, the Imegrated Supply Chain Process, Macmillan Publishing Company New York, NY.,1996
  • 6Remko van Hoek, "Postponement manufacturing:a case study in the food supply chain", Supply Chain Management, 1997.2
  • 7张乃成.汽车线束技术的改进与创新[J].汽车与配件,1999(40):22-23. 被引量:1
  • 8罗振璧,盛伯浩,赵晓波,赵宏林,刘阶萍,蒋任重.快速重组制造系统[J].中国机械工程,2000,11(3):300-303. 被引量:56
  • 9唐寅,易红.可重构生产系统[J].制造业自动化,2000,22(5):4-6. 被引量:13
  • 10罗振璧.未来的制造和过程工程[J].制造业设计技术,2000(1):7-9. 被引量:7

共引文献8

同被引文献11

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部