期刊文献+

后张有粘结部分预应力混凝土连续梁结构全过程非线性分析方法 被引量:2

A Nonlinear Analysis Method of Post-tensioning Bond Partially Prestressed Continuous Concrete Beam
下载PDF
导出
摘要 提出了一个对后张有粘结部分预应力混凝土连续梁结构的全过程非线性分析方法。依据双重M—(?)折线关系,利用杆件有限元和惯用的增量法原理进行近似求解;初步考虑了混凝土的收缩、徐变及钢筋的松驰对预应力混凝土连续梁的非线性影响,并编有计算机计算程序PPCNA,可在IBM微机上进行计算;计算值与试验值吻合较好。 A nonliner analysis method of post-tensioning bond partially prestressed continuous concrete beam is presented. Finite elements of member and common increment method, basing on the double 'M-ψ' fold curves, are used in the method that has tentatively considered the nonlinear effects of shrinkage, creep of the concrete and the relaxation of prestressed steel. Besides, the PPCNA which is operafed on IBM computer is programed . The calculating results coincide with the experiment results very well.
出处 《西北建筑工程学院学报(自然科学版)》 1993年第1期15-22,共8页 Journal of Northwestern Institute of Architectural Engineering
关键词 预应力混凝土 连续梁 非线性 partially prestressed continuous concrete beam, double M-ψ relationship, secondary moment, increment method
  • 相关文献

参考文献1

同被引文献11

  • 1冷金荣.预应力混凝土连续梁抗弯承载力试验研究-施工方法的影响[D].硕士论文.上海:同济大学桥梁工程系,2006.
  • 2A.Moucessian,T.I.Campbell.Prediction of the Load Capacity of Two-Span Continuous Prestressed Beams[J].PCI Journal,1988;130-151.
  • 3T.Y.Lin.Secondary Moment and Moment Redestfibution in Continuous Prestressed Concrete Beams[J],PCI Journal,January-February 1972.
  • 4Y.居易翁.预应力混凝土理论与实验研究(续集)超静定结构[M].上海:上海科学技术出版社,1965.
  • 5屈文俊.连续梁截面的弯矩一曲率关系--后张有粘结部分预应力砼连续梁[J].西北建筑工程学院学报,1988,(2):22-27.
  • 6中华人民共和国国家标准.混凝土结构设计规范(GB50010-2010)[S].北京:中国建筑工业出版社.2010.
  • 7王磊.预应力混凝土超静定结构在极限状态下的次内力研究[D].上海:同济大学,2011.
  • 8王海良,刘宪福.PPC 连续梁塑性行为的试验研究[J].铁道建筑,1998,38(2):5-8. 被引量:1
  • 9王正霖,简斌,黄音.两跨预应力混凝土连续梁的试验分析[J].土木工程学报,1999,32(2):22-27. 被引量:17
  • 10臧博,朱东生,冯长友,向中富.圆钢管混凝土桥墩弯矩-曲率关系分析[J].重庆交通大学学报(自然科学版),2011,30(1):13-18. 被引量:9

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部