日本阪神地震对钢框架节点设计的影响 被引量:7

Influence of Japan Hansin earthquake on steel frame joint
下载PDF
导出
摘要 介绍了1995年日本阪神地震引起的钢框架梁柱节点特别是混合连接节点的破坏情况,分析指出坡口焊缝处的衬板和引弧板造成人工缝,梁翼缘坡口焊缝出现超应力等是造成节点破坏的主要原因.讨论总结了改进节点设计的途径和改进措施,如:改变节点的构造形式,去除梁翼缘焊缝衬板缺口效应,改进扇形切角构造,加强梁腹板与柱的连接等. Abstract:This paper presents the failure situation of beam-column joint in steel frame structures caused by Hansin earthquake of Japan in 1995.Principal factors resulting in the failure were cracks caused by scale board and end tab in groove weld as well as overstress of groove weld in the end of beam flange.Improving measures should include:change the nonstructural form of joint,remove the notch effect on groove weld in beam flange,modify the configuration of sphere corner,and strengthen the connection between web and column.
出处 《沈阳工业大学学报》 EI CAS 2005年第1期107-110,共4页 Journal of Shenyang University of Technology
关键词 阪神地震 钢框架 节点破坏 混合连接 改进措施 Hansin earthquake structural steel framework failure of joints mixed-connection improvement measure
  • 相关文献

参考文献9

  • 1.[A].钢构造委员会.钢构造物の震灾被害全国大会研究讨论论文集[C].东京:日本土木学会,1995..
  • 2.[A].日本建筑学会.阪神地震钢结构补强研讨会论文集[C].神户:日本筑建学会,1995..
  • 3日本建筑学会.铁骨工事技术指针[Z].东京:建筑学会,1996..
  • 4日本建筑学会.铁骨工事技术指针—工场制作编[Z].东京:建筑学会,1996..
  • 5日本建筑学会.钢构造接合部设计指针[Z].东京:建筑学会,2001..
  • 6日本建筑学会.钢构造限界状态设计指针同解说[Z].东京:建筑学会,2002..
  • 7Popov E P, Yang T S, Chang S P. Design of steel MRF Connections before and after 1994 Northridge earthquake[R]. New York: Construction Research Communications, 1997.
  • 8Engelhardt M D, Sabot T A. Seismic-resistant steel moment connections: development since the 1994Northridge earthquake [ R ], New York: Construction Research Communications, America, 1997.
  • 9Taranath B S. Steel concrete, composite design of tall buildings[ M]. second edition, London: McGraw-Hill,1997:965-975.

共引文献1

同被引文献40

引证文献7

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部