期刊文献+

浅议沙钢高线水处理系统的设计

Brief Talk on Designs of the Water Treatment System in Shagang High Speed Wire Rod Engineerings
下载PDF
导出
摘要 介绍了沙钢高线水处理系统的设计,从用水量、水处理系统及水处理构筑物三方面叙述了高线水处理系统设计中有关问题的考虑。在净环水系统中,宜采用两个独立系统,并采用"一次加压,余压上塔"的处理方式。在浊环水系统的处理中,二次平流沉淀池和化学除油沉淀器各有优势,设计中应视实际情况酌情选用。 The designs of water treatment in Shagang High Speed Wire Rod engineerings are introduced. Some problems in designs are recounted from three aspects: amount of using water, water treatment system and that of constructures. In the treatment of closed system of recirculated cooling water, we may adopt two independent systems and can take the treatment method that once being pumped water could go up to cooling towers with the remained pressure. In the treatment of open system of recirculated cooling water, either of the secondary steady settling basin and chemical oil-removed settling tank has advantages, they will be selected for design according to the specific conditions.
作者 李旭
出处 《安徽冶金》 2001年第3期45-48,共4页 Anhui Metallurgy
关键词 高线 实际 优势 有关问题 情况 处理方式 独立 平流沉淀池 水处理构筑物 余压 closed system of recirculated cooling water open system of recirculated cooling water secondary steady settling basin chemical oil-removed settling tank
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部