“A+B+I/D”投标模式中确定最优报价的方法

Determination of optimum price quotation in "A+B+I/D" bidding pattern
下载PDF
导出
摘要 介绍了“A+B+I/ D”的投标模式,指出投标者在制定策略时,要对项目成本、工期和奖罚机制进行综合考虑,以此来确定合适的投标报价和工期,从而在项目建设中获得最大收益。 The 'A+B+I/D' bidding pattern is introduced. Author points out that bidder should take the project cost, limited time and incentive mechanism into considerations in making strategy in order to determine reasonable quotation price and limited time for bidding and acquire maximum return.
作者 王新征
机构地区 石家庄铁道学院
出处 《山西建筑》 2005年第5期141-142,共2页 Shanxi Architecture
关键词 A+B+I/D 投标 综合标价 A+B+I/D, bidding, comprehensive bid price
  • 相关文献

参考文献3

二级参考文献6

  • 1何伯森.国际工程招标于投标[M].北京:中国水利电力出版社,1994..
  • 2Chapman C B (1979), Large Engineering Project Analysis,IEEE Trans Eng Management, EM-26,78-86.
  • 3Hayes R W, Perry J G and Thompson P A (1983), Management Contracting Construction Industry Research and Information Association.
  • 4Koutsoyiannis A (1982), Non-Price Decisions, The Firm in a Modem Context, Macmillan.
  • 5刘允延,马龙友.工程投标极限标价的计算方法[J].施工企业管理,1997(7):29-32. 被引量:1
  • 6杨赞锋,赵彪.AHP 法在评标决策中的应用[J].武汉水利电力大学(宜昌)学报,1998,20(2):82-85. 被引量:2

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部