期刊文献+

MRPII、JIT、TOC生产计划与控制比较研究 被引量:29

A comparative study of production planning management and control among MRPII, TOC, and JIT
下载PDF
导出
摘要 在对MRPII、JIT、TOC三种生产管理思想的适用性和优缺点分析、比较的基础上,在生产计 划与控制的不同层面,根据不同要求,对MRPII、JIT、TOC 进行了定位分析,并把MRPII定 位在厂级或企业级,负责主生产计划、物料需求及各车间零部件的月、周计划;TOC定位在车 间级,负责车间或工段工序日作业计划与调度、物料的投放;JIT定位在生产现场,负责作业 计划的执行、生产的控制和现场的反馈。 Atpresent,many production managementtechnologies have been using in China, such as Manufacture Resource Planning (MRPII), Just in Time (JIT),Theory of Constraints (TOC), et al. It?s necessary to study their advantages and disadvantages in order to adopt their strong points and restrict their weaknesses at best. In this case of studying, a detailed comparative study among MRPII、 JIT&TOC is discussed, then, the suitability of the three technologies is discussed, where MRPII is placed in enterprise level with responsibility for Master Production Schedule(MPS)£?Material Requirement Planning(MRP), and monthly/ weekly componentparts planning on various workshops; TOC is placed in workshop level with responsibility for daily production planning and scheduling and order release on job shop; JIT is placed in production field level with responsibility for the planning execution, production control,and manufacturing state feedback.
出处 《制造业自动化》 北大核心 2005年第2期9-13,共5页 Manufacturing Automation
基金 国家863/CIMS主题资助项目(2001AA412150 2003AA411110)
关键词 MRPⅡ JIT 主生产计划 TOC 物料需求 车间 定位 企业级 调度 作业计划 product planning and control(PPC) TOC MRPII JIT integration
  • 相关文献

参考文献12

  • 1[1]RONDEAU P J, LITTERAL L A. Evolution of manufacturing planning and control systems: From reorder point to enterprise resource planning[J].Production and Inventory Management Journal,2001,42(2): 1-7.
  • 2[2]GOLHAR D Y, STAMM C L. The Just-in-time philosophy:a literature review [J]. International Journal of Production Research, 1991,29(4):657-676.
  • 3[3]GOLDRATT E M. Computerized shop floor scheduling[J].International Journal of Production Research, 1988,26(3):443-55.
  • 4[4]PTAK C A.MRP, MRPII, OPT, JIT, and CIM - succession,evolution, or necessary combination [J]. Production and Inventory Management Journal, 1991,32(2):7-11.
  • 5张煜,张玉坤.中国引进先进生产管理方法现状与思考[J].机械制造,1999,37(9):43-44. 被引量:5
  • 6[6]PLENERT G, BEST T D. MRP, JIT and OPT: What's"best"? [J]. Production and Inventory Management, 1986,27(2):22-29.
  • 7[7]COOK D P. A simulation comparison of traditional, JIT, and TOC manufacturing system in a flow shop with bottlenecks[J]. Production and Inventory Management Journal, 1994(1-5):73-78.
  • 8[8]TAYLORⅢ L J.A simulation study of WIP inventory drive systems and their effect on financial measurements[J] .Integrated Manufacturing Systems, 1999,10(5):306-315.
  • 9[9]YANRADEE P. Application of optimized production technology in a capacity constrained flow shop: a case study in a battery factory[J].Computers Industrial Engineering, 1994,27(1-4):217-220.
  • 10张宗茂,叶飞帆.MRP和JIT两种生产管理系统的比较研究[J].工业工程与管理,1998,3(3):43-47. 被引量:12

二级参考文献4

  • 1刘丽文 等.现代生产管理学[M].北京:清华大学出版社,1994..
  • 2Lee L C. A Comparative Study of the Push and Pull Production Systems. International Journal of Operations and Production Management, 1989,9(4):5-18.
  • 3Peterson J L. Petri-Net Theory and the Modelling of Systems.Prentice Hall, Eaglewood Cliffs, N.J. 1981.
  • 4Bonney M C, Zhang Z, Head M A, Tien C C, Barson R J.Are Push and Pull Really so Different? International Symposium on Inventory Research. Hungary, 1996.

共引文献14

同被引文献156

引证文献29

二级引证文献90

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部