摘要 《合同法》第 286条规定了建设工程优先受偿权,然而,其法律属性存在较大的争议。建设工程优先受偿权的法律属性应明确为法定优先受偿权。同时,要关注建设工程优先受偿权与其他相关权利竞合问题,要完善我国建设工程优先受偿权制度。 The article 286 in contract law prescribes the priority right to be repaid in construction project. However, its property in law is disputed fiercely. This paper discusses every viewpoint, points out that property in law of the priority to be repaid in construction project should be defined as the legal priority right to be repaid. Meanwhile, this paper probes into the priority between the rights to receive construction project repayment and some other related rights and offers several opinions about how to perfect system of the priority right to be repaid in construction project in China.
作者 王龙华
出处 《重庆工商大学学报(社会科学版)》 2005年第1期125-128,共4页 Journal of Chongqing Technology and Business University:Social Science Edition
关键词 优先受偿权 法律属性 竞合问题 相关权利 《合同法》 建设工程 争议 问题探析 法定 制度 construction project priority right to be repaid mortgage right conflict of right
  • 相关文献

参考文献4

  • 1张学文.建设工程承包人优先受偿权若干问题探讨[J].法商研究(中南财经政法大学学报),2000,17(3):101-105. 被引量:58
  • 2曹诗权.对《合同法》第286条的定位[N].法制日报,2000-10-22.
  • 3梁慧星.合同法第286条的权利性质及其适用[EB/OL] 中国民商事法律网,2001-02-04.
  • 4张国香 孙贤程.工程款拖欠引发法律思考[N].人民法院报,2001.8.

二级参考文献4

  • 1郑玉波.《民法物权论文选辑》(下册),台湾五南图书出版公司,1985年版,第688页.
  • 2最高人民法院经济审判庭编.《合同法解释与适用》.新华出版社,1999年版,第642页,第103-107页.
  • 3刁荣华主编.《现代民法基本问题》,台湾汉林出版社1991年版,第142页,第284,第288页
  • 4郑玉波.《民法债编各论》,台湾1981年版.第378页