期刊文献+

企业资源外包优化模型构建与外包对象选择 被引量:7

Construction of Outsourcing Optimal Model and Choice of Outsourcing Object
原文传递
导出
摘要 构建了基于交易费用理论与核心能力观的资源外包优化模型,对企业资源的结构特征进行定性分析;提出了企业价值链环节评价的指标体系;构建了系统模糊优选模型对价值链环节进行定量分析,并用试验结果证明了模型的可行性。 The outsourcing optimal model based on the theory of transaction cost and core capability is constructed to analyze qualitatively the structure character of enterprise's resource.On the basis of putting forward evaluation indexes of value chains,a model based on fuzzy selection for multi-objective decision-making system is applied to evaluate the relative essentiality of value chain.The result is the same as that of the expert making out,which is shown that the new method is very effective.
作者 王德鲁 周敏
出处 《经济管理》 CSSCI 北大核心 2005年第4期20-25,共6页 Business and Management Journal ( BMJ )
关键词 资源外包 模型设计 系统模糊优选 交易费用 outsourcing model constructing fuzzy selection for multi-objective decision-making system transaction cost
  • 相关文献

参考文献8

  • 1迈克尔·波特 陈小悦(译).《竞争优势》[M].华夏出版社,1997..
  • 2刘春林,何建敏,施建军.供应链的协作供应问题研究[J].管理科学学报,2002,5(2):29-33. 被引量:30
  • 3Cross, J., 2002, IT Outsourcing..Bfitish Petroleum's Competitive Approach, Harvard Business Review3, 94-103.
  • 4Teece, J., Shuen, A., 2002, Dynamic Capabilities and Strategic Management, Strategic Management Joumall8,509- 533.
  • 5Weber Charles A., 1998, Current Jhon R.None-cooperative Negotiation Strategics for Vendor Selection, European Joumal of Operation Researchl08, 208-223.
  • 6Sfinivas TaUuri K., 2000, A Cone-ratio DEA Approach for AMT Justification, International Journal of Production Economics66, 119- 129.
  • 7Arnod, U., 2000, New Dimensions of Outsourcing. Journal of Purchasing & Supply Management, 6, 23- 29.
  • 8姚建明,周国华.大规模定制模式下供应链计划调度优化分析[J].管理科学学报,2003,6(5):58-64. 被引量:43

二级参考文献19

  • 1刘春林,盛昭瀚,何建敏.基于连续消耗应急系统的多出救点选择问题[J].管理工程学报,1999,13(3):19-22. 被引量:78
  • 2胡晚霞,仲伟俊,殷非.物料供应决策及其支持[J].决策与决策支持系统,1997(4):81-88. 被引量:3
  • 3Chen Fangrou. Decentralized supply chain subject to information delays[J]. Management Science, 1999, 45(8):1076--1090.
  • 4Cachon Gerard P, Zipkin Paul H. Competitive and cooperative inventory policies in a two-stage supply chain[J]. Management Science, 1999, 45(7): 936--953.
  • 5Cachon Gerard P. Managing supply chain demand variability with scheduling ordering policies[J]. Management Science, 1999, 45(6) : 843--856.
  • 6ICorbett Charles J. Stochastic inventory system in a supply chain with asymmetric information: Cycle stocks, safety stocks, and conksignment stock[J]. Operations Research, 2001, 49(4): 487--500.
  • 7Cachon Gerard P. Stock wars: Inventory competition in a two-echelon supply chain with multiple retailers[J]. Operations Research,2001, 49(5): 658--674.
  • 8ITormos P, Lova A. Tools for resource-constrained project scheduling and control: Forward and backward slack analysis[J]. Journal of Operations Research Society, 2001, 52:779--788.
  • 9Baykasoglu A. Goal programming using multiple-objective TABU search [ J]. Journal of Operations Research Society, 2001, 52:1359--1369.
  • 10刘春林.紧急物资调度的模型与方法研究[M].南京:东南大学,2000..

共引文献183

同被引文献82

引证文献7

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部