摘要
阐述价值工程原理和深基坑工程的功能要求,在对某工程实例拟定的两个方案进行环境和结构安全价值以及成本和工期分析的基础上,提出深基坑围护方案的价值评价指标,并依此简要讨论了所选方案的优化问题。
The VA principle and the function requirements of deep pit engineering are elucidated firstly. After the surroundings & structure safety value, cost and the time limite are analysed, which belong to the two schemes for an engineering example, the elucidated index of value for timbering scheme of deep pit is put forward. Finally, the choosed scheme optimization is brifly discussed.
出处
《工程建设与设计》
2005年第2期53-54,共2页
Construction & Design for Engineering
关键词
深基坑
围护方案
价值分析
价值指标
方案优化
deep pit
timbering scheme
value analsis
value index
scheme optimization