针对当前我省泵站改造中在自动化系统的设计方案、功能要求、软硬件方面存在的不足,在总结我省大禹渡二级站泵站自动化系统的基础上,根据高扬程泵站的特点要求,结合国际计算机最新技术和我国工业控制领域已经成熟的自动化系统结构方案,提出了高扬程泵站综合自动化系统的结构方案和技术标准要求,希望促进我省泵站自动化系统改造的规范化和标准化。
In view of the existing deficiency in automatic system design plan,function demand,hardware and software in pumping station reform works of our province,on the basis of summarization of automatic system of Dayudu second pumping station,and according to technique demand of high-lift pumping station,by combining with the last international computer technique and ripe automatic system construction plan of industry control field in our country,the author presents automatic system construction plan and technique norm demand of high-lift pumping station,and hopes that these plan and demand can promote standardization and normalization in automatic system reform construction of pumping station in our country.
出处
《山西水利科技》
2005年第1期88-91,共4页
Shanxi Hydrotechnics
关键词
泵站自动化
系统方案
功能
要求
automation of pumping station system plan function demand