期刊文献+

高扬程泵站综合自动化系统方案和技术要求 被引量:1

Probing into Comprehensive Automatic System Plan And Technique Demand of High-lift Pumping Station
下载PDF
导出
摘要 针对当前我省泵站改造中在自动化系统的设计方案、功能要求、软硬件方面存在的不足,在总结我省大禹渡二级站泵站自动化系统的基础上,根据高扬程泵站的特点要求,结合国际计算机最新技术和我国工业控制领域已经成熟的自动化系统结构方案,提出了高扬程泵站综合自动化系统的结构方案和技术标准要求,希望促进我省泵站自动化系统改造的规范化和标准化。 In view of the existing deficiency in automatic system design plan,function demand,hardware and software in pumping station reform works of our province,on the basis of summarization of automatic system of Dayudu second pumping station,and according to technique demand of high-lift pumping station,by combining with the last international computer technique and ripe automatic system construction plan of industry control field in our country,the author presents automatic system construction plan and technique norm demand of high-lift pumping station,and hopes that these plan and demand can promote standardization and normalization in automatic system reform construction of pumping station in our country.
作者 王建明
出处 《山西水利科技》 2005年第1期88-91,共4页 Shanxi Hydrotechnics
关键词 泵站自动化 系统方案 功能 要求 automation of pumping station system plan function demand
  • 相关文献

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部