1Robert R.van der Velde,Dirk Pieter van Donk.Understanding hi-project management:engineering complex industrial construction projects[].International Journal of Project Management.2002
2Ahmet Oztas,Onde Okmen.Risk analysis in fixed-price design-build construction projects[].Building and Enivronment.2004
3.
4H. Steyn.Project management applications of the theory of constraints beyond critical chain scheduling[].International Journal of Project Management.2002
5Morris PWG,Hough GH.The anatomy of major projects; a study ofthe reality of project management[]..1987
6Rosenau MD.Successful project management, a step-by-step approach with practical examples[]..1992