一种新型供应链物料需求计划模型 被引量:1

A Robust Model for Supply Chain Material Requirement Planning
下载PDF
导出
摘要 研究了提前期不确定情况下总装生产物料需求计划的优化问题.以供应链库存成本和客户响应时间的平衡优化为目标,通过构造遗传算法的适应值函数求解总装物料的计划提前期,用参数设置模拟各种工程应用的实际情况,使物料的提前/拖期成本较小、客户响应时间较短.该算法同时考虑了上游供应商和下游客户的动态变化,具有很好的柔性.实例计算证明了算法的有效性和应用潜力. The optimization of material requirement planning of assembly manufacture under lead time uncertainty was studied. The problem is to harmoniously optimize supply chain inventory costs and customer respond time, by use of fitness function in genetic algorithm to solve the planned lead times of assembly materials, simulate various engineering applications by parameters setting to make inventory costs less, customer respond time shorter. The arithmetic takes the dynamic changes of upriver suppliers and downriver customers into account at the same time and is flexible. The instance proves the validity and potential of the arithmetic.
出处 《上海交通大学学报》 EI CAS CSCD 北大核心 2005年第1期98-100,104,共4页 Journal of Shanghai Jiaotong University
基金 国家高技术研究发展计划(863)项目(2002AA413017 2003AA4Z3250)
关键词 供应链 物料需求计划 随机提前期 客户响应时间 supply chain material requirement planning stochastic lead time customer respond time
  • 相关文献

参考文献4

  • 1邢文训 谢金星.现代优化计算方法[M].北京:清华大学出版社,2000.141-190.
  • 2陈启申.制造资源计划基础[M].北京:企业管理出版社,2000.85-94.
  • 3Grubbstro R W,Tang K 0.Further development on safety stocks in an MRP system applying Laplace transforms and inputoutput analysts[J].International Journal of Production Economics,1999,60—61:381—387.
  • 4Bookbinder J H,Cakanyildirim M.Random lead times and expedited orders in(Q,r)inventory systems [J].European Journal of Operational Research,1999,115:300—313.

共引文献20

同被引文献4

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部