摘要
本文通过对三明市污水处理厂二期工程施工过程若干问题的探讨,详细介绍过河倒虹管工程施工技术及经验。
this text passes the study to the dirty water processing factory of Sanming two period engineerings start construction some problems of process,detailed introduced the river to pour the siphon engineering construction technique and experiences.
出处
《福建建设科技》
2005年第1期36-37,共2页
Fujian Construction Science & Technology