摘要 岭澳核电站油水分离器厂房FS为深11 7 m的海边地下结构, 周围地下水位较高且与海水相通, 故其抗浮稳定分析与抗浮措施选择是设计的控制因素。通过介绍岭澳核电站FS厂房抗浮锚杆的设计, 探讨了带锚杆底板的内力计算模型。工程实践表明: 在地质条件允许时, 打锚杆是解决地下结构抗浮问题的简单、有效措施。 The oil-water separating workshop (FS) in Lingao Nuclear Power Station is an 11.7 m-deep underground structure near the sea.The water lever around FS is high and in connection with the sea water,so the anti-floating stability analysis and the selection of anti-floating method are the critical factors in design.The design of the anti-floating anchor rod for FS is introduced and the calculation model of the base with the anti-floating anchor rod is discussed.The engineering practice shows that the anti-floating anchor rod is a simple and valid method for solving the floating of underground structures when the geological conditions are adaptable.
作者 裴爱国
出处 《广东电力》 2005年第1期29-31,共3页 Guangdong Electric Power
关键词 抗浮锚杆 抗拔力 油水分离器 FS厂房 地下结构 anti-floating anchor rod upright resistance oil-water separator FS workshop underground structure
  • 相关文献

参考文献1

  • 1NDGJ 5-1988.火力发电厂水工设计技术规定[S].[S].,..

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部