河北热电有限责任公司八期技改工程安装的2台DG410/9.819型CFB锅炉自投运以来,除设备本身出现的缺陷外,在运行过程中因经验不足也出现了文中列举的一些问题,就此从CFB锅炉本身的特点出发进行了认真分析。
After putting into operation of two DG410/9.81-9 CFB boilers in 8th phase technical renovation project of Hebei Power Cogeneration Co., Ltd., a few problems are encountered as exemplified in the text due to lack of operation experience, and in addition to the defects of equipment itself. This paper carefully analyzes all these concerns based on the features of the boiler.
出处
《河北电力技术》
2004年第B12期34-36,共3页
Hebei Electric Power
关键词
CFB锅炉
常见故障
分析
对策
CFB boiler
common faults
analysis
countermeasure