摘要
为在保证工程安全的前提下,增加汛后拦蓄水量,发挥工程兴利效益,对龙凤山汛期防洪采取了分期控制运用,简介了分期控制时段划分及各期控制运用情况。
For the commitment of engineering security, it's beneficial to increase after flood season intercepted water quality and educe the engineering beneficial use. And the time control and application are adopted to control flood in Longfengshan Reservoir during the flood period.This paper briefly discusces the situation of the time interval division and the control and application situation in different period of the time control.
出处
《黑龙江水专学报》
2003年第4期62-63,共2页
Journal of Heilongjiang Hydraulic Engineering College
关键词
调度
汛限水位
分期控制运用
龙凤山水库
dispatch
limited water level during the flood period
time control and application
Longfengshan Reservoir.