摘要
介绍了大同二电厂二期工程两台机空冷平台支柱施工工程概况 ,从模板体系、预埋件安装、混凝土工程等方面详细阐述了其施工工艺流程 。
The general situations of flatform construction work of air-cooled engine in Datong Second power plant are introduced. Corresponding construction technology and quality assurance measures are elaborated in terms of formwork system, installation of embedded members, concrete work and other aspects.
出处
《山西建筑》
2003年第15期37-38,共2页
Shanxi Architecture
关键词
空冷柱
清水混凝土
模板
air-cooled engine, plain concrete, formwork