摘要
介绍了北京地铁八通线三跨连续结合梁桥的工程概况 ,对钢梁的分组与分段问题作了分析探讨 。
The general situations of three-span continuous steel-concrete composite beam bridge engineering in Beijing metro 8-pass line are introduced. And according to grouping and subsection of steel beam discussion and analysis are made. Static preloading method and other treatment measures are proposed to deal with tension and crack-resistance issues of bridge deck.
出处
《山西建筑》
2003年第15期109-110,共2页
Shanxi Architecture
关键词
桥梁设计
钢桥
结合梁桥
连续梁桥
bridge design, steel bridge, steel-concrete composite beam bridge, continuous beam bridge