山西侯马发电厂城市污水回用工程深度处理 ,采用石灰处理系统。经过几个月的调试运行 ,机械搅拌澄清池设计合理 ,运行正常。
Lime process system is adopted in municipal sewage retrieval project of Shanxi Houma Power Plant.Through several months of test,the design of mechanical stirring clarification pool is reasonable and normal to run.