摘要
本文阐述了郑州污水处理厂等直径钢筋混凝土消化池,采用滑升模板施工,连续浇筑混凝土提高工效,经过满水和闭气试验,符合设计要求,保证工程质量取得较好的结果。
In this article, author introduce the same diameter reinforced concrete digestion pool of Zhengzhou sewage treatment plant by the aid of sliding form construction continuously pouring concrete, exalt efficiency. Though functional test in accord with design, guarantee engineering quality and get better effects.
出处
《中州大学学报》
2003年第2期105-106,共2页
Journal of Zhongzhou University