期刊文献+

水电站过渡过程程序可视化设计的思路及实现 被引量:1

Visual Design Idea and Realization in Hydropower Transient Flow Program
下载PDF
导出
摘要 针对水电站过渡过程计算和水电站引水发电系统布置的实际情况 ,利用面向对象方法 ,实现对水电站引水发电系统的图形化模拟 ,实现自动建立实体间的拓扑关系 。 According to the character of the water diversion system and hydropower transient flow program, a new program was developed by using object-oriented method and database is used for storing attribute data. In this method, a basic class is designed for all visualization object class , in this class a database pointer is encapsulated,so it can keep graph and database consistent. In this software, a new thoughts-dynamic coding method is put forward, which finally realizes the automatically analyzing codes method in graphical system of transient flow calculation program.
出处 《水电能源科学》 2005年第1期57-59,共3页 Water Resources and Power
基金 国家电力公司基金项目 (SP1 1 -2 0 0 2 -0 3 -48-0 1)
关键词 可视化程序设计 面向对象方法 动态编号方法 数据库无缝连接 visual program design object-oriented-programming dynamic coding gapless link of database consistent
  • 相关文献

参考文献2

二级参考文献5

共引文献21

同被引文献4

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部