摘要
结合工程实例 ,介绍了火力发电厂汽包吊装计算方法 ,从吊装梁截面设计、汽包吊装工艺等方面进行了论述 ,提出了汽包吊装时的注意事项。
Combined with construction example the calculation method is introduced for steam drum hoisting in steam-power plant and discussed from cross section design of hanging beam, hoisting technology and other aspects. In addition the matters needing attention in hoisting operation are pointed out.
出处
《山西建筑》
2005年第4期66-67,共2页
Shanxi Architecture
关键词
火力发电厂
汽包
吊装梁
截面设计
steam-power plant, steam drum, hanging beam, cross section design