摘要
结合左江水利枢纽工程闸门及埋件施工的实际,介绍施工组织中工期安排、场地布置、设备供应、主要技术措施情况,对其经验教训进行总结。
Combined with the sluice gate and embedded parts construction situation of the Zuojiang multi-pur-
pose dam project, introduced the work term arrangement, space layout, equipment supply and main technique
measure and concluded the experiences.
出处
《广西水利水电》
2003年第B12期60-62,共3页
Guangxi Water Resources & Hydropower Engineering