摘要
左江水利枢纽工程从1988年立项到1999年底建成发电,经历了近12年的历程。在这个历程中发生或经历了许多值得存记与回顾的事件。为了使更多的读者了解左江水利枢纽工程的建设历程,现从该项目的档案资料中把发生过的重要事件按时间顺序摘编成“左江水利枢纽工程建设大事记”,以飨读者。
The construction of the Zuojiang multi-purpose dam project had lasted for 13 years from 1988 to 1999. For
recording the main incidents and made more readers understand the project construction course, the important incidents
were arranged to Construction memorabilia of the Zuojiang multi-purpose dam project in time sequence.
出处
《广西水利水电》
2003年第B12期68-70,共3页
Guangxi Water Resources & Hydropower Engineering