摘要
叙述了格强水电站施工导流的主要特点,并结合工程实际,对施工导流设计中的施工导流标准、施工导流方案、围堰结构型式等几个主要问题进行了探讨。
Discussed the main features of construction diversion of Geqiang hydropower station. Also, combining
with the project practice, probed into the main problems of standard, scheme and the structure, etc. of coffer-
dam.
出处
《广西水利水电》
2003年第B12期88-92,97,共6页
Guangxi Water Resources & Hydropower Engineering