摘要
通过陇眼电站坝址区地质钻探成果,分析该地区岩溶发育特点,并参照类似工程的经验,探讨岩溶地区地质勘探应采用何种手段提高勘察精度。
According to the geology drilling result of the Longyan power station darn site area, analyzed the area
Karst developing features and probed into how to raise the exploring precision in the Karst area by consulting the
similar project experiences.
出处
《广西水利水电》
2003年第B12期98-101,共4页
Guangxi Water Resources & Hydropower Engineering
关键词
陇眼电站
岩溶地区
勘探方法
地质构造
物探资料
the Longyan power station
Karst
geology survey
high density electric
united section method