摘要
通过分析并联电容补偿装置在左江水利枢纽工程指挥部35kV施工变电站的应用,提出在设计并联电容补偿装置应注意的一些问题。
Analyzed the application of parallel connection capacitance compensating sets for 35kV transformer
substation construction of the Zuojiang multi-purpose dam project, expounded the problems due to pay attention
in design.
出处
《广西水利水电》
2003年第B12期108-110,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
并联电容
补偿装置
施工变电站
左江水利枢纽工程
parallel connection capacitance
compensating sets
construction
transformer substation