水布垭水利枢纽采用溜井-平洞运输方式的探讨 被引量:1

An Approach on Shaft Horizontal Tunnel Transport Way in Shuibuya Hydro Project
全文增补中
导出
摘要 水布垭水利枢纽混凝土面板堆石坝坝高 2 33m,大坝地处狭窄河谷 ,坝体高 ,填筑量大 ,开挖利用料的 3个主要供应点 :溢洪道、地下厂房进水口及马崖高边坡等均位于高程较高上 ,若考虑从坝下游运输上坝 ,运距有 6 .5~ 1 0 .0 km,同时施工道路布置困难 ,因此 ,构思了溜井 -平洞运输方案 ,并介绍溜井 -平洞运输方案与常规方案的比较 ,以及对几个主要技术问题的分析 . The concrete face rock fill dam of Shuibuya hydro project is 233 m in height.The dam in the narrow valley,is high.The construction condition is bad because of the complexities of topography and geology.The embankement quantities of the dam are larger.There are three main supply sites with available excavated materials:spillway,entrance of underground power plant and Maya slope,all of which are above the elevation.It is 6.5~10.0 km to transport the excavated materials from both sides of dam and supplementary materials from the quarry to the dam site.Meanwhile,it is inconvenient for general layout of construction,shaft horizontal tunnel can be considered.This paper compares the shaft horizontal tunnel transport way with the regular transport way and analysizes several main technical problems.
作者 童书泉
出处 《长沙铁道学院学报》 CSCD 2000年第1期108-112,共5页 Journal of Changsha Railway University
关键词 混凝土面板堆石坝 溢洪道 溜井 平洞 上坝运输 水布垭水利枢纽 concrete face rock fill dam spillway shaft horizontal tunnel transportation to dam Shuibuya hydro project
  • 相关文献

参考文献1

  • 1北京有色冶金设计研究院.采矿设计手册(3)[M].北京:中国建筑工业出版社,1989..

共引文献1

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部