期刊文献+

给定调车线数量条件下的列车编组方案优化 被引量:10

The Optimization of the Train Formation Plan with Shunting Line Constraints
下载PDF
导出
摘要 本文给出了带有调车线数量限制和改编能力约束的列车编组计划模型的数学表达式及其解。该数学表达式表现为一个具有非线性目标函数及线性与非线性约束条件的大规模0-1规划问题。我们采用模拟退火技术解此问题,对于真实铁路网规模的问题,该方法可以有效地获得接近全优的解。文末,给出了在COMPAQ-386/25e上运算的部分结果。 This paper presents the formulation and solution train formation plan model for technical stations with sorting capacity and the number of shunting lines as constraints. This formulation results in a large scale 0-1 programming problem with nonlinear objective function and linear or nonlinear constraints. A simulated annealing technique is used to solve the problem. The procedure makes it possible to efficiently obtain close-to-optimal solutions to problems of realistic railroad network size. Finally, we report some computational test results on COMPAQ-386/25e.
机构地区 西南交通大学
出处 《中国铁道科学》 EI CAS CSCD 北大核心 1993年第4期23-31,共9页 China Railway Science
关键词 调车线 编组计划 车流组织 shunting line, train formation plan, 0-1 programming, simulated annealing
  • 相关文献

参考文献2

  • 1M. Lundy,A. Mees. Convergence of an annealing algorithm[J] 1986,Mathematical Programming(1):111~124
  • 2V. ?erny. Thermodynamical approach to the traveling salesman problem: An efficient simulation algorithm[J] 1985,Journal of Optimization Theory and Applications(1):41~51

同被引文献86

引证文献10

二级引证文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部