摘要
为了解线性规划问题需要一个初始基可行解,为此常常求助于大M法或两阶段法.笔者详细讨论大M法,并对每种情况指出M大到什么程度,才能得到正确的结论.
in order to solve the linear programming problem (LP) initial basic feasible solution is needed. Thus,big M method or two-stage method is usuallyresorted. In this paper,the big M method is discussed in detail. And it is pointed out that how largethe number M should be for each case in order to achieve the correct conclusion.
出处
《天津城市建设学院学报》
CAS
1996年第3期41-46,共6页
Journal of Tianjin Institute of Urban Construction