摘要
本文分析长江界牌河段历次河工模型试验中有关岸边流速的资料,探求航道整治工程修建后引起岸边流速变化的规律,为全面认识航道整治与河道防洪的关系提供参考.
The purpose of this paper is to analyse data obtained from the scale model tests of the Jiepai Reach of the Yangtze River. The effect of navigation work on inshore current velocity is studied, and the relation between navigation work and flood control is discussed.
出处
《长沙交通学院学报》
1994年第2期65-73,共9页
Journal of Changsha Communications University
关键词
模型试验
岸边流速
航道整治
model test
arrangement
regulated water stage
complex section
inshore current velocity