摘要
对我国引进的第一套节能型合成氨装置,如何优化操作、缩短开车时间,谈了自己的观点和工厂的具体作法,并论述了这些做法的可行性和使用效果。
he author gives his opinions on how to optimize the operation and shorten the start-up time of the first set of imported energy-sav-ing ammonia plant,presents the specific actions taken by his factory and states the feasibility and actual effect of these actions.
出处
《大氮肥》
1994年第6期415-416,共2页
Large Scale Nitrogenous Fertilizer Industry
关键词
一段炉
合成塔
冷箱
操作
合成氨生产
optimize,primary reformer.synthesis column,cold tank,operation