三峡水电机组选型建议

The Suggestion for Hydraulic Turbines and Generators Selection of Three Gorges Hydroelectric Set
下载PDF
导出
摘要 三峡电站水头变幅较大,最大水头与额定水头的比值高达1.4,单机容量大,机组台数多,汛期又有一定数量的泥沙过机,机组选型难度较大。本文根据三峡电站的特点,对机组主要技术数据(如转轮直径、转速、吸出高度、轴向水推力)的选择,总体布置、发电机冷却方式、推力轴承、水轮机转轮制造等问题,提出了一些建议。 There are some characteristics of hydroelectric sets in Three Gorges power station,such as large varying range of head, the ratio of maximum head to rated head up to 1.4, large capacity and number of units, a number of sande at flood season. According to the charaeteristics of the power station, some suggestions for selecting main technical data (diameter of runner,rated speed,suction head, axial hydraulic thrust load), general arrangement of units,methods of cooling generators,thrust bearing and turbine runner manufacture,etc.are raised in this paper.
机构地区 哈尔滨电机厂
出处 《大电机技术》 北大核心 1994年第6期41-51,共11页 Large Electric Machine and Hydraulic Turbine
关键词 三峡电站 水轮发电机 冷却方式 Three Gorges power station diameter of runner axial hydraulic thrust load method of cooling
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部