期刊文献+

运行方式对三峡输电网络的影响

Influence of Operation Mode on the Three Gorges Power Transmission Network
下载PDF
导出
摘要 本文根据三峡电站可行性论证报告中三峡输电系统的电网结构,计算了丰水年的丰水期大、小运行方式和枯水年的枯水期大、小运行方式下的潮流分布,提出了几个影响三峡电站输电网络结构的问题和建议,供今后三峡电站电力系统研究和设计时参考和采用。 In this paper according to the composmon of transmission network in the feasiblity report on the three Gorges Project,he power flow allocation was calculated for operating mode of peak and low load peried during high flow season in rainy year,andfor that during olw flow season in dry year.Some suggestions and problems, which influence the composition of transmission net-work of the Three Gorges power plant, are giver for research and design of power systme of the Three Gorges from now on.
作者 杨杰
出处 《电网技术》 EI CSCD 北大核心 1994年第1期8-13,共6页 Power System Technology
关键词 运行方式 三峡水电站 输电系统 Operating mode Three Gorges hydroelectric power station Transmission system Composi-tion of transmission
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部