摘要
无井架液压滑模施工工艺在烟囱工程中已被广泛应用。本文着重介绍了150/4.5m钢筋混凝土烟囱工程,对烟囱内衬、操作平台、液压提升系统及垂直运输等部位进行了设计改进,满足了施工需要。
The construction process of hydraulic slide model without derrick are widely used in the chimney construction. In this article the engineering of 150/4.5m chimney of reinforced concrete is mainly introduced. The chimney liner, the operation platform, the hydraulic lifting system and the rertical transporation etc. have been improved and the needs of construction are met.
出处
《石油工程建设》
北大核心
1989年第6期34-37,共4页
Petroleum Engineering Construction