浙江嵊县电厂二期扩建工程是国家采用75t/h循环流化床锅炉的完善化示范工程.本文在实际调查、分析的基础上,提出了对该厂燃料制备系统的扩建构想.该构想利用了原系统的大部分设备,同时适应了场地占用小、煤源多变的情况,被采纳为设计方案.
Based on investigation and analysis. the paper described the consideration for extension project of fuel preparation system for ShengXian Power Plant. The jeatrues of this design programe was as follows: (1) Most of equipments in original system was reused; (2) It occupied a smaller space;(3) It was suitable for various coals.