摘要
介绍了双鸭山矿务局集贤煤矿在四三○五采区生产准备过程中应用网络技术,使工期缩短52天的具体经验。
This paper introduces the experience that the time limit for the project of№4305 district productive preparation has been cat short by fifty-two days in Jixian CoalMine of Shuangyashan Coal Mining Bureau by using network technology.
关键词
采区
采区生产
网络技术
煤矿开采
district, productive preparation,network technology application.