期刊文献+

借鉴国外经验挖掘焦化装置潜力 被引量:1

USING FORIEGN EXPERIENCES TO TAP THE POTENTIALITY OF DELAYED COKING UNIT
下载PDF
导出
摘要 本文简要地介绍了国外改进加热炉设计、降低循环比、采用中子料位计和阻泡剂、缩短焦炭塔的操作周期等提高焦化装置处理量和提高焦化装置液体收率的经验。并结合本厂焦化装置的具体情况,着重讨论了加热炉和焦炭塔的潜力问题,并提出了较具体的看法和建议。 Aimed at increasing the capacity and total liquid yield of the south cok-ing unit of No.2 refinery,foreign experiences including heater design improv-ement,reducing recycle ratio,application of neutron level indicator and antif-oaming agent,shortening operating cycle of coking drum,etc.are briefly revie-wed.Based on the specific conditions of the coking unit,the latent potent-ialities of heater and coking drum are emphatically discussed with specificviews and suggestions presented.
作者 张世泽
出处 《石油炼制》 CSCD 1989年第7期12-16,共5页
  • 相关文献

同被引文献3

  • 1张友民,李庆国,戴冠中,张洪才.一种RBF网络结构优化方法[J].控制与决策,1996,11(6):667-671. 被引量:24
  • 2Bishop C. Improving the Generalization Properties of Radial Basis Function Neural Networks[J]. IEEE Trans N N, 1991, 3(4):579-588.
  • 3Patricia A T. Data Rectification and Gross Error Detection in a Steady - state Process via Artificial Neural Networks[J]. Ind Eng Chem Res, 1993, 32(12):3020-3028.

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部