摘要
根据京唐港东挡沙堤工程实践,对挡沙堤顶护面块体改型的问题进行了探讨。
This paper makes discussion on the problem of changing the shape of the armor block for the top of sediment barrier according to the practice of the east sediment barrier project of Beijing and Tangshan Port.
出处
《港工技术》
1994年第4期7-9,17,共4页
Port Engineering Technology
关键词
挡沙堤
矩形空心块
护面块体
港口
sediment barrier, rectangular hollow block, armor block