摘要
青云水厂的建设规模为40万 m^3/d,分两期建设,第一期先建设20万m^3/d.本文在系统介绍水源选择、取水工程和一期净水厂设计的同时,并对二期工程的预留与安排作了说明,最后还简介了一期工程的有关建设指标.
Qingyun Waterworks in Nanchang. Jiangxi Province in south China was constructed in two phases with capacity in first phase 200, and total 400 thousand cubic meters per day. The water sources selection, intake works and water treatment works of the first phase as well as the preparation and arrangement for the next phase are presented in this paper. The construction indices of the first phase are summarized here too.
出处
《给水排水》
CSCD
1994年第5期9-15,共7页
Water & Wastewater Engineering