摘要
上海市嘉定第二水厂一期工程取水25万m^3/d,供新建水厂10万m^3/d,供第一水厂及有关乡镇15万m^3/d.对水源选择、取水位置确定及浑水输水方案进行了论证,经反复讨论、专家评估后决定采用长江取水分步实施、逐步完善的方案.
The capacity of water intake of the 1st phase of the 2nd waterworks in Jiading District, Shanghai is 250 thousand cubic meters per day, 100 for the constructing waterworks and 150 for the 1st waterworks and neighbor towns around Jiading respectively. On the basis of conscientious discussion and expert approvement on water source selection, intake point and transportation of raw water ,a program to take water from Yangtze River and to be implemented step by step has been drawn up.