摘要
已倾斜的建筑物的基底有砂垫层时,最经济、最简捷的纠斜方法常常掏砂法.掏砂形成的砂墩的变形决定了整个纠斜过程的速度和安全控制。本文介绍了砂墩变形的模拟试验和仿真试验的研究成果.
To an inchined building with sand ushion beneath its foundation, the most economical and convinent way of inclination correction is usually scooping sand method. Deformation of sand piers produced during scooping determines velocity of process of inclination correction and controls safety. This paper presents the study resultS of analogous tests and simulation tests of sand pier deformation.
出处
《工业建筑》
CSCD
北大核心
1994年第12期32-35,共4页
Industrial Construction