摘要
红粘土是当地较好填料,但必须根据工程特性确定设计参数,尤其是碾压设计参数,省内早期唯一的一座红粘土土石坝水电工程,在施工三年后改建坝型,本文将予分析探讨。
The only red clay soil-rock dam of Baihua hydropower station in Guizhou built 3 years ago now need to reconstruct its dam pattern, whcih suggests that the red clay is a good filling suitable for the dam, but the determination of this material must be based on design parameters for engineering properties, especially the properties of grinding and campacting.
出处
《贵州地质》
1994年第2期171-177,共7页
Guizhou Geology