简要介绍了大亚湾核电站反应堆冷却剂管道的安装程序,冷却剂管道的预制、就位调整、对口焊接和检验,以及系统试压、管道保温层安装等工作.
This paper describes briefly the installation procedure, the fabrication, fitting up, positioning, adjustment and welding of piping, examinations, hydrostatics testing and insulationof piping for reactor primary circuit piping of Daya Bay Nuclear power Plant.
出处
《核动力工程》
EI
CAS
CSCD
北大核心
1994年第1期1-6,18,共7页
Nuclear Power Engineering
关键词
压水型堆
冷却剂
管道
安装
Reactor primary circuit piping Installation adjustment Liquid penetrating examination Radiographic examination