大亚湾核电站全范围模拟机的验收试验 被引量:3

Acceptance Test of Full Scope Simulator of Daya Bay NPP
下载PDF
导出
摘要 本文简要介绍了大亚湾核电站全范围模拟机验收试验的目的、试验分类、主要内容以及对试验不符合项的处理。全范围模拟机的模型验证以及硬件设备的试验不在本文介绍的范围之内。试验结果证明广东核电站全范围模拟机采用的计算模型是成熟的,它对正常瞬态以及事故瞬态的模拟,完全达到了合同所规定的技术规范的要求。 This paper describes the purpose,the classification and the main process of the acceptance test of full scope simulator of Daya Bay Nuclear Power Plant,including the correction of nonconformance items which are discovered during the performance of acceptance tests.This paper doesn't cover the model validation and the hardware testing of the full scope simulator. The results of the acceptance tests show that the model accepted by the full scope simmulator of Daya Bay Nuclear Power Plant is fully able to cope with the simulation of normal transients and incidental transients and the performance of the simulator indeed complied with the technical specifications which are defined in the relevant contracts.
作者 张善明
出处 《核动力工程》 EI CAS CSCD 北大核心 1994年第3期210-214,共5页 Nuclear Power Engineering
关键词 验收试验 核电站 模拟器 大亚湾 Simulator Acceptance test Transient Non-conformance items
  • 相关文献

同被引文献17

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部