期刊文献+

机械工业共性制造技术政策要点说明(模具部分) 被引量:3

原文传递
导出
机构地区 机械部科技司
出处 《机械工艺师》 CSCD 1994年第6期2-4,共3页 Machinery Manufacturing Engineer
  • 相关文献

同被引文献11

  • 1熊禾根,李建军,孔建益,杨金堂,蒋国璋.考虑工序相关性的动态Job shop调度问题启发式算法[J].机械工程学报,2006,42(8):50-55. 被引量:33
  • 2NAIDU J T.A note on a well-know dispatching rule to minimize total tardiness[J].International Journal of Management Science, 2003, 31(2) : 137-140.
  • 3MOSHEIOV G,ORON D.A note on the SPT heuristic for solving scheduling problems with generalized due dates[J]. Computer & Operations Research, 2004,31(5):645-655.
  • 4Sadao Shimoyashiro, Kenichi Tsoda, Hiroshi Avane. Input Scheduling and hJad Balance Control for a Job Shop[ J]. International Journal of Production Research, 1984, 22(4) : 597 - 605.
  • 5Lawrence M wein, Philippe B Chevalier. A Broader View of the Job- shop Scheduling Problem[J]. Management Science, 1992, 38(7): 1018- 1033.
  • 6Stevenson M, Hendry L. Aggregate toad - oriented workload control: a review and a re - classification of a key approach [ J ]. International Journal of Production Econoatics, 2006,104(2) :676 - 693.
  • 7Wight O W. Input/Output Control: a Real Handle on Lead Times[J]. Production and Inventory Management, 1970, 11: 9- 30.
  • 8贾子超.准时化生产(JIT)实施基本条件探讨[J].企业技术开发,2009,28(4):11-13. 被引量:5
  • 9申永胜,刘莹.工科基地建设与创新型人才培养[J].高等工程教育研究,2000,48(2):25-28. 被引量:21
  • 10冯晓光.WTO呼唤高职人才培养模式的转变[J].教育发展研究,2002,22(3):41-43. 被引量:69

引证文献3

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部