水利水电工程中耗用钢筋量很大,如能采用线性规划法寻求钢筋下料的最优解则可提高钢材的利用率,降低工程成本.
he large amount of reinforcement is consumed in hydraulic project co-nstruction.If linear programming is used to solve the optimization problem ofreinforcement cutting,it is capable of raising the utilization ratio of reinforcement and reducing construction cost.
出处
《江西水利科技》
1994年第2期110-116,共7页
Jiangxi Hydraulic Science & Technology
关键词
钢筋
残料
线性规划
下料
Reinforcement
Remains,Linear programming,Rational cutting