摘要
柘林土坝由于设计标准偏低、坝身和坝基存在质量问题,经批准增建砼防渗墙。现就满足施工和大坝安全条件下的坝顶削挖高程、施工期内控制蓄水位、施工中的坝体稳定校核、悬挂式砼防渗墙的施工安全、特殊池段防渗墙施工、材料试验和选择作了概要介绍。
wing to tbe design standard downward bias of the Za-Lin earth daln,thebodv and the foundation of the dam exists defects of qualities.It was authorizedto budd the addtion of concrete cutoff wall.This paper has a brief introductioaunder satisfyingthe construction and datn safe condition:the elevation of dam topcutl the elevation control of storage water in construction period,the checking ofbody stability in construction; the constrtiction safety of the suspended concretecutoff wall,construction in special site, the lnaterial choice and the materialtesting and so on。
出处
《江西水利科技》
1994年第4期283-291,共9页
Jiangxi Hydraulic Science & Technology
关键词
土坝
混凝土
截水墙
施工组织设计
Large datm
Concrete cutoff wall
Construction organizational design