柘林大坝砼防渗墙施工组织设计概要 被引量:1

An outline of construction organizational design of concrete cutoffuall of the Za-Lin dam
下载PDF
导出
摘要 柘林土坝由于设计标准偏低、坝身和坝基存在质量问题,经批准增建砼防渗墙。现就满足施工和大坝安全条件下的坝顶削挖高程、施工期内控制蓄水位、施工中的坝体稳定校核、悬挂式砼防渗墙的施工安全、特殊池段防渗墙施工、材料试验和选择作了概要介绍。 wing to tbe design standard downward bias of the Za-Lin earth daln,thebodv and the foundation of the dam exists defects of qualities.It was authorizedto budd the addtion of concrete cutoff wall.This paper has a brief introductioaunder satisfyingthe construction and datn safe condition:the elevation of dam topcutl the elevation control of storage water in construction period,the checking ofbody stability in construction; the constrtiction safety of the suspended concretecutoff wall,construction in special site, the lnaterial choice and the materialtesting and so on。
作者 黄良恢
出处 《江西水利科技》 1994年第4期283-291,共9页 Jiangxi Hydraulic Science & Technology
关键词 土坝 混凝土 截水墙 施工组织设计 Large datm Concrete cutoff wall Construction organizational design
  • 相关文献

同被引文献3

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部