摘要
本文简单介绍了我国的水力资源调查、河流开发规划和1949~1988年的水电建设进程;论述了大型水电站、中小型水电站、高坝建设、地下工程、水轮发电机组的发展情况,提供了大量资料;最后探讨了今后更大的水电发展,需依靠体制改革、技术进步和抓紧做好前期工作等问题。
The survey of hydropower resources,planning of river harnessing, and the evolution of hydropower development during 1949-1988 are introduced in this paper. The construction of large hydropower projects,medium-sized and small hydropower stations,high dams,underground works, and hydro-turbine-generators are described with plenty of data. At last,it is discussed about the further greater development which should depend on the organization reform,technology progress and close attention to the fine preparatory investigations.
出处
《水力发电学报》
EI
CSCD
北大核心
1989年第4期1-19,共19页
Journal of Hydroelectric Engineering